General erection of backup boilers with light fuel oil tank

Ostrołęka | Poland | 2011-2012

General erection of backup boilers with light fuel oil tank

Ostrołęka | Poland | 2011-2012
Industrial and Energy Engineering
SCOPE
01erection of backup boiler building – Stage I02complete installation of 3 oil backup boilers (StandardKessel)03delivery and erection of steam, condensate, oil and air pipes (DN700 to DN10) together with cut off, control and safety armature04manufacturing and erection of flue gas ducts made of corten B steel05installation of feed pump and light oil pumps06design, manufacturing , erection and commissioning of fuel oil tank, concrete tub roofing, pipebridge connection to backup boilers building07auxiliary structures