Biomass feeding system
Ostrołęka | Poland | 2012
Biomass feeding system
Ostrołęka | Poland | 2012
Technical parameters of the power plant
fluized bed boiler - OP-650, boiler capacity - 650 t/h, boiler efficiency - 91.5%
Biomass unloading and storage system
2 bucket conveyors - 110 t/h, 2 storage tanks - 2,200 m³
Mass
300 tons
Industrial and Energy Engineering
Production of Steel Structures
SCOPE
01
manufacturing
02
erection
03
steel structures for conveyor bridge, unloading stations
GALLERY
01
03
02
03
03
03
More realizations from the category Industrial and Energy Engineering:
01
Modernization of biomass storage and handling system
02
Flue gas purification installation
03
Selective Catalytic Reduction (SCR) installation
04
Multi saw set
05
Sulphuric acid tank
06
SCR SKID
07
Ash and slug discharge system
08
Retrofit of biomass feeding system
09
Catalytic NOx reduction installations
Return
Homepage
News
Contact
About OMIS Company
General Information
Permissions and Certificates
Innovations
Green Change
Offer
Production of Steel Structures
General Contracting
Industrial and Energy Engineering
Design
References
Categories:
All Projects
Production of Steel Elements
General Contracting
Design
Industrial and Energy Engineering
Region:
Poland
Europe
World
LinkedIn
Youtube
PL
EN
EN
PL