Biomass power plant

Jaworzno | Poland | 2010-2012

Biomass power plant

Jaworzno | Poland | 2010-2012
Turbogenerator power50 MWe
Fluidized-bed boilerOFz-201
Boiler capacity201 t/h
Boiler efficiency91.5%
Biomass unloading and storage systemQ total = 145 t/h
Forest biomass handling system135 t/h
Agro biomass handling system35 t/h
Montaż z dostawąIndustrial and Energy EngineeringProduction of Steel StructuresDesigning
SCOPE
01Design02Manufacturing03Erection04Commissioning